Ocean Campus
Notice of Smith Hall Scheduled Power Shutdown

10/26/2019

There is a scheduled power shutdown for Smith Hall this Saturday, October 26th at 8:00 AM . The shutdown is necessary to connect newly installed power cables to an existing electrical panel which will provide power to the newly installed power outlets in the cafeteria. The shutdown is expected to last up to 6 hours.

PDF Removed

Contact:
Toby Lee
Project Manager (CUMMING)
415-640-8168
tlee@ccorpusa.com

Ocean Campus - Notice for Power Outage at Conlan Hall - Construction for Portables

9/1/2019

Please be notified that there will be a temporary power outage in Conlan Hall on Sunday, September 1, 2019, from 8:00 am to 11:00 am for construction purposes. Power will be returned to normal operation outside of these hours.

For any questions or issues please use the contact below.

Contact:
Project Manager (AECOM)
Joshua Dawson
424-358-8040
Joshua.dawson@aecom.com

Ocean Campus - Notice of Closure of Parking Lot Behind Conlan/Smith Hall

NOTICE (Updated 8/30/2019)

8/12/2019 - 10/2/2019

Please be notified that there will be construction work in the parking lot behind Conlan and Smith Hall. Scope includes trenching, grading and installation of 3 temporary modular offices and 1 temporary modular restroom.

Work will commence on August 12, 2019 and be completed on October 2, 2019. The parking area will be closed between these dates. For any deliveries or special needs during this time please use the contact below to arrange the required access. Click here for a PDF Removed.

Please note that pedestrian traffic will still be permitted via the pedestrian bridge to the campus.

Contact:
Project Manager (AECOM)
Bruce Bagnoli
415-456-7203
Bruce.bagnoli@aecom.com

Chinatown / North Beach Center

Monday, June 24, 2019

The elevator (Car #3) at the Chinatown/North Beach Center will be down for a period of two weeks for repair.

Ocean Campus

Wednesday, May 29, 2019

The San Francisco Water Department will be performing water meter work at Judson Avenue on Wednesday, May 29, 2019 from 9:00 AM to 5:00 PM. Please note that there may be reduced water pressure on the East Side of Campus possibly affecting the 600 & 700 Bungalows, Tennis Courts, and Recycling Center during this time.

For questions or concerns, please contact Tom McGee, SF Water Dept., at 650-303-0761.

Multi-Use Building

Tuesday, May 28, 2019

Notice of backflow water system repairs on Tuesday, May 28, 2019 from 5:00 PM to 9:00 PM. Please note there will be no water service during this time.

Arts Extension Transformer Replacement

On December 12, 2018, a new electric transformer was installed in the Creative Arts Extension building on Ocean Campus restoring permanent power to the facility.

Mission Center

Partition installation for Child Development program.

Evans Center

Windows cleaned & building exterior washed and painted.

Cloud & Science Hall

Smart classrooms painted.

Wellness Center

New expansion tank installed.

Roof Repairs

  • Cloud Hall - Investigation of areas of water intrusion on-going. Quote solicited for Room 105 water intrusion and requesing additional quotes.
  • Visual Arts Building Roof Repairs - Soliciting quotes for repair.
  • Rosenberg Library - Investigation of areas of water intrusion.