CM 244 Construction Scheduling (3)
Lec-3, field trips
Credit, Degree Applicable
P/NP Available
PREREQ.: CM 240 or demonstration of CM 240 exit skills
Study of the basic concepts of construction scheduling: scheduling techniques with a focus on Critical Path Methods; CPM schedule planning, scheduling, updating and analysis. Manual procedures in scheduling are followed by computer applications.