Construction started in August, 2005 of the new Mission Campus, which is located in the heart of the Mission District and will not only serve the educational needs, but the community as well. Many of the features of the 1935 and 1938 “art nouveau” building will be preserved, where Mission Campus and San Francisco Unified School District’s Downtown High School are located. The addition of two 4 story buildings will create a secure courtyard for the needed outdoor space.

Main Project Elements

• Shared facilities with Downtown High School
• Multi-use spaces
• Child Development Center
• Student Services area
• Latino Parent Center
• Art Exhibits space
• Bookstore and Café
• Parking Availability
• Graphic Communication Labs, Science Labs, Language Labs, Computer Labs and Traditional Classrooms
• Broadcasting facilities and classrooms (TV and Radio)
• Administration offices, Facility offices and lesson preparation facilities
• Conference, Meeting facilities, Library and multi-media rooms


  MissionPhoto
  Specifications
Construction Estimate: $66 million, including state contribution of over
$30 million.
Estimated Completion Date: Fall 2007
Total Floor Area: 197,904 Sq. ft. (3 buildings)
Assignable: 119,000 Sq. ft.
Site Area: 56,240 Sq. ft.
80% Ground Level Coverage
Building Bulk: 4 stories
50 parking spaces at basement level.
Site control: 75 year ground lease.
Anticipated completion date: August 2007

 

 