spacer JohnAdamsTitle
The main building was constructed in 1911 and needs both major infrastructure and cosmetic repairs, as well as seismic and electrical/technology upgrades. A seismic upgrade to the gym building was completed and the remodeling began early in 2003, with programs moving into this space in the spring semester. The plan is to return the gymnasium to its original state and expand PE offerings to include basketball, volleyball, aerobics, badminton, martial arts, and adaptive PE for DSP&S students. Phase 2 Bond improvements needed in this campus facility will include: seismic upgrade of main building, remodel of bathrooms, library expansion, exterior door and window replacements, replace floors, remodel Vocational Nursing skills labs, remodel Counseling, Matriculation and Admissions and Records space, provide office space for faculty, upgrade electrical system, install technology network, signage for interior and exterior of buildings, and remodel DSP&S offices. This work will be done in 2007.
  JohnAdamsBuilding
Specifications
Estimated cost of Phase 2 is over $35 million, with approximately $27 million funded by the State.