City College of San Francisco
Facilities Planning & Construction
NEW MISSION CAMPUS
AWARDED CONTRACTS

| |
Original Estimate |
Bid Due |
Awarded to |
Amount |
|
Phase 1 Bid Packages: |
|
|
|
|
|
1.1 Demolition & Abatement |
$1,050,000 |
6/28/05 |
Cleveland Wrecking Co. |
$1,394,822 |
|
1.2 Dewatering |
$60,000 |
7/14/05 |
Viking Drilling |
$140,800 |
|
1.3 Earthwork |
$1,200,000 |
6/28/05 |
Granite Excavation & Demolition |
$719,688 |
|
1.4 Shoring & Underpinning |
$800,000 |
7/19/05 |
Granite Excavation & Demolition |
$639,000 |
|
1.5 Pedestrian Barrier |
$80,000 |
7/14/05 |
Rubecon General Contracting |
$104,000 |
|
1.6 Structural Shoring |
$100,000 |
7/19/05 |
No Bidders |
N/A |
|
1.7 Structural Steel & Stairs |
$5,000,000 |
7/19/05 |
Gayle Manufacturing |
$8,712,000 |
|
1.8 Temporary Power and Safe Off |
$100,000 |
6/28/05 |
Morrow Meadows |
$123,474 |
|
Phase 2 Bid Packages: |
|
|
|
|
|
2.1 Reinforcing |
$1,200,000 |
8/25/05 |
Pacific Coast Steel, Inc. |
$1,303,697 |
|
2.2 Concrete & Shotcrete |
$3,000,000 |
8/25/05 |
McCarthy Building Co., Inc. |
$3,349,500 |
|
Phase 3 Bid Packages: |
|
|
|
|
|
3.1 Metal Decking |
$520,000 |
10/20/05 |
Pacific Erectors, Inc. |
$643,426 |
|
3.2 Waterproofing |
$220,000 |
11/01/05 |
FD Thomas Corp. |
$243,418 |
|
3.3 Elevators |
$365,000 |
10/18/05 |
Ascent Elevators, Inc. |
$365,000 |
|
Phase 4 Bid Packages: |
|
|
|
|
|
4.1 Fire Protection |
$840,000 |
11/04/05 |
Transbay Fire Protection,
Inc. |
$989,800 |
|
Phase 5 Bid Packages: |
|
|
|
|
|
5.1 Mechanical |
$40,000 |
11/08/05 |
No bidders |
N/A |
|
5.2 Plumbing |
$40,000 |
11/08/05 |
No bidders |
N/A |
|
5.3 Electrical |
$4,000 |
11/08/05 |
No bidders |
N/A |
| 5.4 Temporary Heat |
$90,000 |
12/08/05 |
Not awarded |
N/A |
| 5.5 Underslab
Plumbing |
$130,000 |
12/08/05 |
O'Brien Mechanical, Inc. II |
$258,777 |
| 5.6 Underslab
Electrical |
$14,000 |
12/06/05 |
Not awarded |
N/A |
|
Phase 6 Bid Packages:
|
|
|
|
|
|
6.1 Man Hoist |
$420,000 |
2/16/06 |
No Bidders |
N/A |
| 6.1 Man
Hoist Re-Bid |
$420,000 |
3/13/06 |
Sheedy Hoist |
$314,946 |
|
6.2 Framing, Gypsum Board & Plaster, Bldg A |
$2,700,000 |
3/9/06 |
|
|
|
6.3 Glass Unit Masonry |
$48,000 |
3/2/06 |
John Jackson Masonry |
$120,129 |
|
6.4 Metal Fabrication |
$800,000 |
3/2/06 |
C.E. Toland & Son |
$2,039,190 |
|
6.5 Glazing & Aluminum Panels |
$1,900,000 |
4/6/06 |
Bid Rejected |
N/A |
|
6.6 Control Joints & Sheet Metal |
$300,000 |
3/2/06 |
Van-Mulder Sheet Metal, Inc. |
$376,769 |
|
6.7 General Works 1 |
$1,350,000 |
3/2/06 |
ISEC, Inc. |
$1,670,895 |
|
6.8 Insulation & Firestopping |
$310,000 |
2/16/06 |
Coast Building Products |
$227,549 |
|
6.9 Sprayed Fireproofing |
$310,000 |
2/16/06 |
Freas Plastering Co. Inc. |
$309,038 |
|
6.10 Coiling & Upward Sectional Doors |
$90,000 |
2/16/06 |
United California Glass and Door |
$144,740 |
|
6.11 Smoke Containment System |
$100,000 |
2/16/06 |
Partition Specialties, Inc. |
$135,787 |
|
6.12 Framing, Gypsum Board & Plaster, Building B |
$1,500,000 |
3/9/06 |
North Bay Drywall & Plastering Inc. |
$1,682,000 |
|
6.13 General Works 2 |
$400,000 |
3/2/06 |
ISEC, Inc. |
$445,004 |
|
Phase 7 Bid Packages: |
|
|
|
|
|
7.1 GFRC |
$200,000 |
3/2/06 |
Architectural Facades Unlimited, Inc. |
$202,114 |
|
7.2 Carpentry and Protection |
$50,000 |
2/23/06 |
Rubecon General Contracting, Inc. |
$70,040 |
|
7.3 Doors, Frames, Hardware |
$800,000 |
3/2/06 |
ISEC, Inc. |
$851,998 |
|
7.4 Mechanical |
$5,200,000 |
3/14/06 |
Western Allied Mechanical, Inc. |
$6,310,658 |
|
7.5 Security |
$200,000 |
3/2/06 |
AEC Alarms |
$293,800 |
|
Phase 8 Bid Packages: |
|
|
|
|
|
8.1 Site Concrete |
$165,000 |
4/17/06 |
No Bidders |
N/A |
|
8.1 Site Concrete Re-Bid |
$165,000 |
5/18/06 |
|
|
|
8.2 Site Utilities |
$95,000 |
3/30/06 |
Andrew M Jordan Inc., dba A&B
Construction, Inc. |
$89,320 |
|
8.3 Interlocking Pavers & Cut Stone |
$60,000 |
4/18/06 |
No Bidders |
N/A |
|
8.4 Landscaping & Irrigation |
$50,000 |
5/25/06 |
|
|
|
8.5 Roofing |
$635,000 |
4/17/06 |
Pioneer
Contractors, Inc. |
$613,180 |
|
8.6 Tile |
$595,000 |
4/17/06 |
American
Tile & Brick Veneer, Inc. |
$530,090 |
|
8.7 Acoustical Ceiling |
$490,000 |
4/17/06 |
Spacetone
Acoustics, Inc. |
$458,366 |
|
8.8A Resilient Flooring, Building A |
$1,000,000 |
4/27/06 |
H.V.
Welker Co., Inc. dba Welker Brothers |
$807,060 |
|
8.8B Resilient Flooring, Building B |
$540,000 |
4/27/06 |
Pro
Installation Inc., dba ProSpectra Contract Flooring |
$471,625
|
|
8.9 Carpeting |
$60,000 |
4/27/06 |
|
|
|
8.10 Painting – Building A |
$400,000 |
4/20/06 |
KED
Construction |
$406,245 |
|
8.11 Painting – Building B |
$200,000 |
4/20/06 |
Blue Skies Painting |
$234,000 |
|
8.12 Library Theft Protection |
$45,000 |
4/18/06 |
No Bidders |
N/A |
|
8.13 Casework & Millwork |
$1,100,000 |
4/27/06 |
Dow
Diversified, Inc. |
$778,419 |
|
8.14 General Works 3 |
$ 100,000 |
5/25/06 |
Rubecon
General Contracting, Inc. |
$433,540 |
|
8.15 Plumbing |
$2,600,000 |
4/20/06 |
O'Brien Mechanical, Inc. |
$2,359,875 |
|
8.16 Data & Communication |
$800,000 |
4/20/06 |
Cal Coast Telecom |
$555,698 |
|
8.17 Electrical |
$5,700,000 |
4/20/06 |
Cupertino Electric |
$5,248,769 |
|
Phase 9 Bid Packages: |
|
|
|
|
|
9.1 Glass and Glazing, Building A |
$500,000
|
5/31/06 |
C/S Erectors, Inc. |
$640,000 |
|
9.2 Aluminum Panel System, Building A |
$450,000 |
5/25/06 |
C/S
Erectors, Inc. |
$595,202
|
|
9.3 Storefront, Building A |
$200,000 |
5/31/06 |
C/S Erectors, Inc. |
$585,431
|
|
9.4 Glass and Glazing, Building B |
$1,200,000 |
5/31/06 |
C/S Erectors, Inc. |
$2,389,835
|
|
9.5 Exterior Framing and Plaster,
Building A |
$1,000,000 |
5/25/06 |
North Bay
Drywall & Plastering Inc. |
$1,998,820
|
|
9.6 Interior Partition Systems,
Bldg A Basement – 3rd Flr |
$1,500,000 |
5/25/06 |
North Bay
Drywall & Plastering Inc. |
$1,773,917 |
|
9.7 Interior Partition Systems,
Building A 4th Floor |
$200,000 |
5/25/06 |
North Bay Drywall & Plastering Inc. |
$209,650 |
|
Phase 10 Bid Packages: |
|
|
|
|
|
10.1 Testing and Balance |
$100,000 |
7/20/06 |
National Air Balance Company, Inc. |
$110,000 |
|
10.2 Louvers |
$120,000 |
7/20/06 |
Western Allied Mechanical, Inc. |
$234,101 |
|
10.3 General Works 4 |
$1,190,000 |
7/20/06 |
Rubecon General Contracting, Inc. |
$1,124,152 |
|
10.4 Lab Casework |
$150,000 |
7/20/06 |
ISEC, Incorporated |
$160,505 |
|
10.5 Lead Remediation |
$100,000 |
7/20/06 |
LVI Environmental Services, Inc. |
$115,734 |
|
10.6 Miscellaneous Metals |
$250,000 |
7/20/06 |
C.E. Toland & Son |
$264,620 |
|