City College of San Francisco
Facilities Planning & Construction
CHINATOWN / NORTH BEACH CAMPUS
AWARDED CONTRACTS

| |
Original Estimate
MAIN BUILDING |
Original Estimate
ANNEX BUILDING |
Bid Due Date |
Awarded to |
Amount |
|
GROUP 1 |
|
|
|
|
|
Invitation to Bid
Pre-Bid Conference Attendees List - Bid Packages 1.10, 3.10, 3.30, 3.60
Pre-Bid Conference Attendees List - Bid Packages
5.10, 5.40, 3.20B |
|
|
|
|
|
1.10 Glazing, Metal Panel, Louvers - Exterior
Bid Package 1.10
Addendum No. 1
Addendum No. 2
Bid
Tabulation |
$7,892,166 |
$749,565 |
10/8/09 at 2:00 PM |
|
|
3.10 Glass Fiber Reinforced Concrete (GFRC) Panels
Bid Package 3.10
Addendum No. 1
Addendum No. 2
Bid
Tabulation |
$2,224,660 |
$1,037,855 |
10/8/09 at 3:00 PM |
|
|
3.30 Basement Waterproofing
Bid Package 3.30
Bid
Tabulation |
$510,072 |
$221,524 |
10/6/09 at 3:00 PM |
|
|
3.60 Elevators
Bid Package 3.60
Bid
Tabulation |
$2,572,000 |
$835,000 |
10/6/09 at 3:30 PM |
|
|
4.30 Tower Crane for Main Building
Addendum 1 |
$750,000 |
N/A |
Combined with Bid Package 5.10 |
|
|
5.10 Concrete - Place and Finish, Form & Re-Bar (Main)
Bid Package 5.10
Addendum 1
Bid
Tabulation |
$9,355,434 |
N/A |
10/14/09 at 2:30 PM |
|
|
5.40 Concrete - Place and Finish, Form & Re-bar (Annex)
Bid Package 5.40
Bid
Tabulation |
N/A |
$2,630,876 |
10/8/09 at 2:30 PM |
|
|
3.20B Shoring & Mass Excavation (Lot 5 Only)
Bid Package 3.20B
Bid Tabulation |
N/A |
$746,528 |
10/8/09 at 2:30 PM |
|
|
|
|
|
|
|
|
|
GROUP 2 |
|
|
|
|
|
Invitation to Bid
Pre-Bid Conference Attendees List - Bid Packages
3.70, 3.80
Pre-Bid Conference Attendees List - Bid Packages
5.14, 8.11, 8.14 |
|
|
|
|
|
3.70 Plumbing
Bid Package 3.70
Bid Tabulation |
$2,425,534 |
$759,665 |
10/12/09 at 2:00 PM |
|
|
3.80 Electrical/ Fire Alarm/ Security/ AV
This Bid Package is Re-bidding - See Group 6 Below |
$10,232,803 |
$2,709,686 |
10/12/09 at 2:30 PM |
|
|
5.14 Professional Survey
Bid Package
5.14
Bid Tabulation |
$140,331 |
$40,064 |
10/15/09 at 2:00 PM |
|
|
8.11 General Labor – Phase 1
Bid Package
8.11
Bid Tabulation |
$187,500 |
$62,500 |
10/15/09 at 2:30 PM |
|
|
8.14 Security – Access System/ Guards
Bid Package
8.14
Bid Tabulation |
$491,373 |
$163,791 |
10/15/09 at 3:00 PM |
|
|
|
|
|
|
|
|
|
GROUP 3 |
|
|
|
|
|
Invitation to Bid
Pre-Bid Conference Attendees List - Bid Packages
3.40, 4.20. 5.70, 5.80 |
|
|
|
|
|
3.40 Mechanical
Bid Package
3.40
Bid Tabulation |
$5,693,923 |
$1,172,395 |
10/20/09 at 2:00 PM |
|
|
4.20 Personnel & Material Hoist
Bid Package
4.20
Bid Tabulation |
$1,170,000 |
$650,000 |
10/20/09 at 2:30 PM |
|
|
5.70 Structural Steel
Bid Package
5.70
Addendum 1
Bid Tabulation |
$437,421 |
$126,300 |
10/20/09 at 3:00 PM |
|
|
5.80 Metal Stairs, including Arch. Stairs
Bid Package
5.80
Bid Tabulation |
$495,000 |
$203,500 |
10/20/09 at 3:30 PM |
|
|
|
|
|
|
|
|
|
GROUP 4 |
|
|
|
|
|
|
Invitation to Bid |
|
|
|
|
|
3.11 Building Management
System (BMS)
Bid Package
3.11
Bid Tabulation |
$653,158 |
$172,959 |
10/27/09 at 2:00 PM |
|
|
3.50 Fire Protection
Bid Package
3.50
Bid Tabulation |
$1,089,380 |
$198,613 |
10/27/09 at 2:30 PM |
|
|
5.13 Food Service
Equipment
Bid Package
5.13
Bid Tabulation |
$11,600 |
$723,650 |
10/27/09 at 3:00 PM |
|
|
|
GROUP 5 |
|
|
|
|
|
Invitation to Bid
Pre-Bid Conference Attendees List - Bid Packages
5.11, 5.12, 6.10, 6.20 |
|
|
|
|
|
5.11 CMU (Interior and Exterior)
Bid Package
5.11
Bid
Tabulation |
$162,680 |
$293,825 |
11/17/09 at 2:00 PM |
|
|
5.12 Window Washing, embeds & equip
Bid Package 5.12
Addendum 1
Bid
Tabulation |
$450,000 |
N/A |
11/17/09 at 2:30 PM |
|
|
6.10 Misc. & Ornamental Metal
Bid Package 6.10
Bid
Tabulation |
$811,080 |
$169,445 |
11/17/09 at 3:00 PM |
|
|
6.20 Laboratory Equipment
Bid Package
6.20
Bid
Tabulation |
$229,460 |
N/A |
11/17/09 at 3:30 PM |
|
|
|
|
|
|
|
|
|